EC Company
Solar Panels
Project included the installation helical piles to support solar panels. The Solar panels were arranged in five arrays for a total capacity of 2.4 mega watts. Because the project is housed on leased land minimizing ground disturbance was important. Also, typical life of Solar Panels is 20 or 30 years, so ease of removing the support posts with minimal disturbance is also important. Helical piles may be removed as easily as they are installed. Helical pile offers both of these advantages over other ground support systems.
McDowell NW Pile King installed 474 each 2-3/8” diameter shaft helical piles with double helical flights 10” & 10”. Each helical pile was installed a minimum of 11’ below grade. After the 11’ lead helical section is installed an extension shaft is added to allow the panels to be supported three feet above grade or six feet above grade. Helical piles were installed both vertical and at 30 degrees using a high capacity torque drill motor. Helicals piles were installed to approximately 5 tons compression and 5 tons tension design load.
ABOUT US
The advantage of the Pile King™ patented equipment is its very nature of being compact for working on limited access sites and yet able to safely wield powerful hydraulic hammers...
RECENT PROJECTS
McDowell’s roots in the construction industry goes back to the 40’s working on the Denny regrade in Seattle. We have since specialized in piling and deep foundation systems since the late 60’s...
FAQ
Got questions about your project? We’ve got answers. Just ask if you don’t see what you are looking for...
MCDOWELL NORTHWEST
Looking for auger cast piling or soldier piling? Click here to visit McDowell Northwest...